Roche ACCU-CHEK Inform II Manuel de l'opérateur Page 96

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 160
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 95
Initial Startup
96
Installing the battery pack 1 Loosen the screws on the battery pack until they
are protruding about 4-5 mm (2/10 in).
2 Position the battery pack alongside the meter so
that the plug connector is level with the socket
inside the meter.
3 Plug the connector plug into the socket.
4 If necessary, use a suitable tool (such as the Torx
screwdriver) to push the plug completely into the
socket.
Vue de la page 95
1 2 ... 91 92 93 94 95 96 97 98 99 100 101 ... 159 160

Commentaires sur ces manuels

Pas de commentaire