Roche ACCU-CHEK Inform II Manuel de l'opérateur Page 101

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 192
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 100
Initial Startup
101
5 Place the tapering end of the battery pack on the
small ledge of the opening and push down like a lid
to close (as shown in the illustration below). Make
sure that the plug connector wires slide into the
groove provided for them on the battery pack.
Gently pushing down the “lid” as described here
helps to align the wires properly so that they do not
get pinched or bent.
6 The battery pack should now t neatly inside the
meter. If this is not the case, check whether the
screws have been loosened enough or if the wires
are caught between the sides of the battery pack
and the meter.
7 Tighten both screws until snug (do not overtighten).
Until then, the cover will have some play due to the
inner gasket and the o-rings around the screws.
After you have tightened the screws, the cover
should be ush with the sides of the meter.
Vue de la page 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 191 192

Commentaires sur ces manuels

Pas de commentaire