Roche ACCU-CHEK Inform II Manuel de l'opérateur Page 97

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 192
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 96
Initial Startup
97
9 Initial Startup
Connecting the base unit
NOTICE
To ensure continuous safe and reliable operation, use
only the power supply unit provided for the ACCU-CHEK
Inform II system (for ordering information see page 143).
1 Slide the base unit upward and remove it from the
wall mount (if in use).
2 Connect the power cord to the proper outlet.
3 If you want to connect the ACCU-CHEK
InformII Base Unit in a wired environment:
Connect the Ethernet (RJ45) cable or the USB
cable to the respective outlet. Use only the USB
cable provided with the ACCU-CHEK Inform II
system.
4 Slide the base unit back onto the wall mount (if in
use).
For details on conguring the ACCU-CHEK Inform II
Base Unit, consult your Roche representative or for
technical assistance contact ACCU-CHEK Customer
Care.
Vue de la page 96
1 2 ... 92 93 94 95 96 97 98 99 100 101 102 ... 191 192

Commentaires sur ces manuels

Pas de commentaire