Roche ACCU-CHEK Inform II Manuel de l'opérateur Page 83

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 192
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 82
Linearity Testing
83
Performing a linearity test
Overview of test procedure
A linearity test comprises the following steps:
n Check the lot number of the linearity solutions.
n Check the lot number of the test strips.
n Perform the test with a minimum of three linearity
solutions.
Starting a linearity test
The following description assumes that the meter is
powered on and the main menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The
Linearity Test screen opens.
Vue de la page 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 191 192

Commentaires sur ces manuels

Pas de commentaire